Preloader

Tanger Free Zone (TFZ)

A Multisectoral Industrial Platform Beside Tangier's Airport

Solar Energy Solutions for Businesses in Tanger Free Zone

Tanger Free Zone was established in 1999 immediately adjacent to Ibn Batouta International Airport, and has grown into one of Tangier’s most significant industrial platforms, spanning around 400 hectares and home to more than 500 companies across automotive, aeronautics, textile, electronics, logistics and service activities. Nearby industrial areas such as Gzenaya, Moghogha, Al Majd and Tanger Automotive City form part of the wider Tangier industrial landscape, though each remains a distinct zone in its own right. Green Taqa works with manufacturing, logistics and processing businesses operating within Tanger Free Zone, assessing each facility’s solar potential individually rather than assuming a single answer for the whole zone.

What We Offer

Solar Capabilities for Tanger Free Zone Facilities

Industrial Rooftop Assessment

We assess roof condition, structural capacity and available space across industrial and warehouse buildings within Tanger Free Zone.

Commercial & Factory Solar Systems

We design systems for factory floors, production halls and commercial facilities based on their specific electrical infrastructure.

Solar Energy Assessment

We start with your electricity bills and consumption pattern to establish whether solar fits your operational profile.

System Design and Engineering

Our engineers configure the system to match your electrical infrastructure and production schedule.

Financial and Investment Modelling

We build a financial picture from your real tariffs and consumption data, not generic estimates.

Monitoring and Ongoing Support

Once installed, systems can be monitored to support ongoing performance and future expansion planning.

Our Project Approach

How We Deliver a Solar Project in Tanger Free Zone

Site & Energy Assessment

We review your electricity consumption and inspect your facility's roof and site conditions.

Technical Design

Our engineers design and size the system to match your infrastructure and operating schedule.

Proposal & Planning

You review a complete technical and financial proposal before any commitment.

Installation & Handover

We install, test and commission the system, then hand over a fully operational installation.

Our Impact

Up to 40%

Possible Electricity Cost Savings

25 Years

Fixed Energy Price Term

Tanger Free Zone

Primary Service Area

Where Solar Fits Within Tanger Free Zone Operations

Facilities with steady daytime electricity use and available roof or land space tend to be the strongest solar candidates, a pattern common across much of Tanger Free Zone’s manufacturing and logistics base. As with any site, the right answer depends on the facility’s own consumption and structural conditions rather than its sector alone.

Sector Range

Automotive, Aeronautics, Textile and Logistics

Facility Types

Factories, Warehouses and Processing Plants

Primary Zone

Tanger Free Zone, Tangier

Savings Potential

Up to 40%

Payback Range

~5 Years

Legal Framework

Law 82-21

Why Choose Green Taqa

What Businesses in Tanger Free Zone Can Expect

Experience Across Multiple Sectors

Familiarity with the energy patterns of automotive, aeronautics, textile and logistics operations.

Site-Specific System Design

Every system is engineered around your facility's actual roof, land and consumption data.

One Team From Start to Finish

Feasibility, financing, construction and maintenance stay with a single accountable team.

Quality-Focused Installation

Technical planning and installation carried out to a consistent professional standard.

Frequently Asked Questions

Questions From Businesses in Tanger Free Zone

Many facilities in the zone can be assessed for solar, subject to roof condition, available space and electricity consumption. Suitability is confirmed through a proper site assessment rather than assumed.

Warehouses and factory buildings often have large, relatively uninterrupted roof areas, which can be favourable for solar. Structural capacity and consumption still need to be confirmed on site.

We start with your electricity bills and consumption pattern, then inspect your site's roof, land and electrical infrastructure before proposing a system.

Yes. We work with automotive, aeronautics, textile, electronics and logistics facilities, assessing each one based on its own electricity use rather than a single sector-wide assumption.

Send us your recent electricity invoices and basic site details, and we will return a consumption analysis with an initial estimate for your location in Tanger Free Zone.