
Regus CFC My Way. Bloc D. Boulevard Main Street, Finance City, Casablanca, 20036, Morocco
The Sidi Bernoussi-Zenata industrial zone dates back to 1964 and today spans more than 400 hectares, home to over 500 operating businesses, one of the largest concentrations of industry in Casablanca. The area sits within a wider northern industrial corridor that extends toward Ahl Loughlam, Karea, Beaulieu, Sidi Moumen, Zenata and Aïn Sebaâ, connected by the N1, the motorway to Rabat and the coastal road. The zone’s own industry association, IZDIHAR, has previously run energy and water efficiency programmes for local businesses, a sign of how seriously energy costs are already taken here. Green Taqa works with manufacturing, logistics and processing facilities across this district, assessing each site’s solar potential individually.
We review your electricity bills and consumption history, whether your building dates from the zone’s earlier development or is a more recent addition.
We assess roof condition, structural capacity and available space, since Sidi Bernoussi’s industrial buildings vary considerably in age and construction.
Our engineers configure the system to match your electrical infrastructure and operating schedule.
We project costs and expected savings from your real tariffs and consumption data, not generic estimates.
We check the technical, financial and regulatory factors specific to your facility before you commit to anything.
You receive a complete report covering system design, costs and expected performance for your site.
We start by reviewing your facility's electricity use and business priorities.
Our engineers visit to confirm structural and electrical conditions.
You receive a complete technical and financial proposal before deciding anything.
We construct and start up the system, ready for full operation.
Possible Reduction in Electricity Costs
Fixed Energy Price Term
Primary Service Area
Manufacturing and logistics buildings with steady daytime electricity use and available roof space are generally strong solar candidates, a pattern common across much of Sidi Bernoussi’s industrial stock. As with any site, the right answer depends on the facility’s own consumption and structural conditions rather than its location alone.
Manufacturing, Logistics, Chemical and Metal Processing
Factories, Warehouses and Processing Plants
Sidi Bernoussi, Casablanca
Up to 40%
~5 Years
Law 82-21
Familiarity with the structural realities of a district built up since the 1960s.
Support extends across Sidi Bernoussi-Zenata, including Ahl Loughlam, Karea and Beaulieu.
Feasibility, financing, construction and maintenance stay with one accountable team.
Every recommendation is based on your facility's actual consumption, not a district-wide assumption.
Often, yes, though it depends on the building. What matters most is roof condition, structural capacity and available space, factors we confirm through a proper site assessment rather than assuming based on the building's age.
Many warehouses have large, relatively uninterrupted roof areas, which can be favourable for solar. Suitability still depends on structural capacity and your facility's electricity consumption.
Yes. These areas form part of the wider Sidi Bernoussi-Zenata industrial corridor, and we assess facilities there on the same basis as any site in the district.
It can be a factor in some cases, particularly around roof structure and electrical capacity, which is exactly what our technical assessment is designed to check before any recommendation is made.
Send us your recent electricity invoices and basic site details, and we will return a consumption analysis with an initial estimate for your location in Sidi Bernoussi.
Regus CFC My Way. Bloc D. Boulevard Main Street, Finance City, Casablanca, 20036, Morocco
Subscribe to receive solar tips, energy saving insights, & latest updates.
Copyright © 2026 All Rights Reserved.